Kitchen Remodel

Our plans for this kitchen have changed so many times in the past 7 months.  We originally wanted to keep as much of the kitchen intact as possible to reduce the amount of waste that we would be contributing to a landfill.  Home improvement shows always talk about kitchen remodels with “eco-friendly materials”, but no one ever addresses how much landfill waste is generated with each remodel.  We planned to keep as much of the existing kitchen as possible and make it work for us.

Plan A was to clean and repaint the existing cabinets, update them with some new hardware, and replace the existing cheap, chipped laminate countertops with new bamboo countertops.  We also planned to keep the existing floor tiles since they seemed to be in decent shape and we kind of liked them.  We soon realized that using the existing cabinets would not really be possible since they were falling apart, and they were dirty beyond the point where any reasonable amount of cleaning would help the situation.  Some of the pieces were even missing, and that plan got thrown out pretty quickly.

tumblr_m230buEVsf1qh2ttzo1_500

Plan B involved removing the existing cabinets and quickly replacing them with some cabinets salvaged from my aunt & uncle’s recent kitchen remodel.  The cabinets were only a couple of years old, so we figured that would be a great low-cost and environmentally friendly option (saving their old cabinets from the landfill, yay!).  We planned to get the cabinets in and set up, and then repaint them after they were installed (in the interest in saving time and work space).  We were still planning to use the bamboo countertops, so we went ahead and ordered them, thinking it would take a while for them to be delivered (it did not – they came way faster than we expected).

Once the original cabinets in our house were removed, we quickly realized that replacing them would not be as simple as we had thought.  There were holes in the wall, areas of missing drywall, no exterior insulation, and many other problems.  My husband then had to make the decision to tear out all of the walls and fix all of the problems before putting the cabinets in place.  That was the longest part of our kitchen remodel, which got stretched out over many months with him being gone out of town quite a bit of that time (for work and with prepping our Texas house for sale).

tumblr_m2ygeu6tbV1qh2ttzo1_500

Here he replaced the window, and found a very clever way to repurpose some found materials.

tumblr_m3miv96KS81qh2ttzo1_500

It turned out that there were actually three layers of wall that needed to be removed.  Once the walls were finished, we now had a huge gap of space where the existing tiles did not cover the floor all around the kitchen.  There were also spots under the old cabinets where there were no tiles at all.  As much as we didn’t want to rip out the old tiles, we felt we were left with no choice.  My husband ripped out the old ceramic tiles and began replacing them with the new marble tiles that we picked out.

tumblr_marsrnJ8NL1qh2ttzo1_500

tumblr_mcd46dlBHn1qh2ttzo1_r2_500

We planned to set aside the usable cabinets that were originally from our kitchen and save them for when my husband builds us a garage (originally high on the priority list).  However, we have had to adjust the priorities around here quite a bit lately and the garage project has unfortunately gotten demoted to the bottom of the priority list with the new baby on the way.  We may end up donating those cabinets since it is driving us nuts to have cabinets sitting around in the yard and patio.

At this point, my husband started seriously evaluating our plan to repurpose my aunt & uncle’s old cabinets.  His original plan for those cabinets involved cutting apart and rebuilding many of them to get them to meet the sizes we would need.  We would also need some additional cabinets to fill in some areas where we had nothing that would work.  Before we started any of the kitchen remodeling, we picked out and ordered our appliances, countertops, and our farmhouse style kitchen sink, all of which have been sitting around in various rooms of our house, still in boxes.  The salvaged cabinets would not fit the microwave vent combo or the farmhouse sink, and would need some major modifications.

Life with a pregnant woman with multiple food allergies and no kitchen in our home has not been easy for my husband.  This kitchen remodel dragged on way more than either of us ever expected.  We also did not expect that I would be pregnant in the middle of the whole thing.  Given all the things on his plate currently (work, a year+ long intensive training program for his work which involved a lot of traveling, fixing up & trying to sell that house in Texas, etc.), he was afraid that it would take him another number of months to get those salvaged cabinets functional for our needs.  As much as we weren’t looking forward to another huge expense at this moment, we decided the best option was to move onto Plan C.

Plan C meant donating those salvaged cabinets and ordering new ones.  It all actually started when I was at Home Depot looking for more paint swatches, saw a Martha Stewart Kitchens catalog and brought it home for organizing ideas.  I kept telling him how nice it was that they gave away such a beautiful catalog for free. 🙂  Next thing we know, I am obsessed with a particular style in the catalog and we are in the store ordering all new cabinets.  They said the cabinets would take a minimum of five weeks to be ready, but (surprise!) we got a call that they were ready for delivery way earlier than we expected (so they had to sit in our living room for a while).

tumblr_mcvxx3DBHz1qh2ttzo1_500

The cabinets being ready early was both good news and bad news.  The flooring was not finished yet, and we had not had a chance to donate the two sets of cabinets that have been cluttering up all of our spare rooms, side yard, patio and trailer.

Originally, I was planning to stencil the accent wall in the kitchen with a large scale stencil that I ordered.  However, I have been having some problems with my pregnancy, including a trip to the emergency room due to way too early contractions.  I have been put on bed rest for the time being and have not been able to work on any of the projects with the house that I had planned for the past few weeks.  The kitchen walls will just have to be solid yellow until I am feeling a little better.  I also have not been able to work on the gardening at all, which unfortunately means all of my second season veggie garden plans have been postponed for the time being. 😦

Here is a quick preview of all of the progress my husband has made on the kitchen lately…almost functional!
tumblr_mdntdrhEsa1qh2ttzo1_500

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s